Nothing happens in a vacuum, and architecture is no exception. Architectural projects don’t often get to start from scratch — they often deal with existing building conditions, such as a renovation or connection of new construction to an existing structure. And usually the documentation must reflect multi-phase construction, such as design-built construction delivery or traditional design-bid-built with several phases.
Setting Up Your Model for Renovation Projects
Posted by
Samantha Hyatt on 10/4/17 9:13 AM
| 1 min read time
Topics: Architecture, Vectorworks, 2D workflows, IFC export, multi-phase construction, design-bid-built, demolition plans, phased construction plans, design-built construction, BIM workflow, layers and classes, object libraries, views and viewports